What is joint procedure order in railway?

What is joint procedure order in railway?

Sub: Joint Procedure Order (JPO) for Installation & Maintenance of Network connectivity for Parcel Management System over Indian Railways. In case of failure of data-communication equipments on the Parcel Management System , CRIS will organise the rectification of the problem.

What are the different types of rail joints?

Different Types of Railway Joint

  • Common Rail Joint. Common rail joint is the most commonly used rail joint in the connecting of the steel rail, and it is usually with regular shape.
  • Compromise Joint Bar.
  • Joggled Rail Joint.
  • Insulated Rail Joint.
  • Glued Insulated Rail Joint.

    Can I change department in railway?

    Gangmen / Trackmen may be allowed to change department to Mechanical, Power, Traffic, Commercial and to Works side of Engineering Deptt.

    What is rakshak railway?

    PORTABLE WIRELESS – UP/DN WARNING SYSTEM (011212) This project “RAKSHAK” has been conceived with the idea of providing wireless safety warning system to the work force – working along the Railway tracks, about the approaching trains. For this purpose, coded signals are transmitted to indicate UP/DN approaching train.

    Which is the ideal rail joint?

    Rail joint should hold the two ends of the rails as nearly as possible. The two ends should be at the same level and in the same straight line. Rail joint should have same strength and stiffness as rails which it joins. Joint should provide space for the expansion and contraction of rails.

    What are the requirements of standard rail joints?

    Requirements of Good Rail Joint

    • It should be strong, stiff and give some strength as that of the original rail section.
    • It should be cheap and durable.
    • The rails provide continuous and level surface for movement of train.
    • It should maintain the gauge distance of the track.

    Is there any departmental exam in Railway?

    General Departmental Competitive Examination (GDCE) is being held in Railways to fill up 25% Vacant Posts in Group C Cadre. In order to have more clarrity in the procedure of GDCE, Railway Board has issued Consolidated Instructions on 02.08. 2018.

    How can I transfer in Railway?

    A Railway employee claim as a matter of right to be transferred to any other Railway establishment….Place of posting will be

    1. Place of posting will be decided by the officer concerned depending on vacancy.
    2. Apply to DPO for Mutual Tranfer.

    Which joint is made on the ends of railway track?

    As a rail joint, the bolted joints are usually used to join rail tracks together before the are welded. As to joining two rails with differing sections, the compromise joints are mostly used. And the insulated joints are always used as the bonded or non-bonded joints.

    What are the requirements of good joint?

    1) It should be economical and easy in construction. 2) It should be water-tight. 3) It should offer resistance to the penetration of the tree roots. 4) It should be capable of resisting the effects of acidic, alkaline or gaseous actions of the sewage.

    How much should be the strength of a rail joint?

    4. How much should be the strength of a rail joint? Explanation: A rail joint will be called an ideal joint if its strength is equal to the strength of the parent rail.

    What are the requirements of rails?

    8 Requirements of an Ideal Rail

    • An ideal rail should be of adequate steel composition and manufactured by open hearth or duplex process.
    • The vertical stiffness of an ideal rail should be high in order to transmit the load to the below sleepers.
    • The head of the rail should have enough depth to allow for vertical wear.

    How are rail joints mounted on a rail?

    Two pieces of rail joint bars are usually used together as a pair. Each rail joint bar has one side configured to the rail web side. Mechanical fasteners mount the joint bars to the web sides.

    Which is the third category of rail joints?

    The third category is based on the performance of rail joints. Under this category, we subdivided it into standard rail joint,compromise rail joint,conducting rail joint,insulated rail joint and welded rail joint. It is the most basic rail joint. The rails it connected are having same weight and length.

    Why do you need a compromise rail joint?

    Compromise rail joint It is mainly used to connect two different types of rails to make sure the continuity of railway. Under normal conditions, in order to make the top surface and the inner side head of rails are matched up, it will use the corresponding special-shaped rail joint and rail pad with it.

    What kind of rail joints match re bars?

    Recommended Rail Joints Match RE Rail Joints Bars Recommended Rail Drillings and Bar Punchings for 115 RE, 119 RE, and 133 RE, Utilizing 1 Inch Track Bolts Recommended Rail Drillings and Bar Punchings for 132 RE, 136 RE, 140 RE Rails, and 141 RE Rails and Joint Bars, Utilizing 1-1/8 Inch Track Bolts